Arena Product Overview

Industry Forums Join a forum dedicated to industry-focused issues. View the forum threads or register to post your own messages!

Click a link below to view its corresponding industry success story.



Reorganizing the Passenger Flows in Terminal 2 with support of Arena contributed by SAT AG.
   
De-peaking Lufthansa Hub Operations at Frankfurt Airport contributed by SAT AG.
   
Bayer Corporation: Eliminates Expense of Proposed Investment
   
ITG : Locates Major Bottlenecks for Adhesives Manufacturer
   
ITG: Helps increase Sales by More Than $1 Million
   
Apparel Manufacturer Evaluates Systems Throughput, Scheduling Operations, and More
   
Apparel Manufacturer: Creates Distribution System Transition
   
Airport Package Sortation Facility: Fine-tunes Conveyor Systems
   
Munich Airport Passenger Terminal Simulation Study (in German)
   
Post Denmark: Improves Mail Sortation Process
   
Major Apparel Manufacturer: Improves Warehousing Operation
   
Danish Mail: Saves 20% in Personnel Expenses
   
Development of a High-Level Supply Chain Simulation Model
   
Designing the Support Logistics for the FAA ACE-IDS System
   
[TC]2: Supply Chain Cuts Lead time by 55%, Slash Inventory by 80%
   
Electronics Manufacturer Saves Over $50 Million with Redesigned Logistics Supply Chain
   
Bayer Corporation: Analyzes Capacity Requirements at Barge-Dock
   
Apparel Manufacturer: Studies Distribution System Transition
   
Package Sortation Facility: Fine-tunes Conveyor System Performance
   
Schneider: Overhauls Logistics Network
   
Major Electronics Manufacturer: Redesigns global supply chain
   
Coloplast: Reduces Delivery Lead Time by 50%
   
Railway Operator: Saves 50 Million Dollars
   
Government Cargo Contractor: Attains High Delivery Rate
   
UPS: Reduces Aircraft Turnaround Time from hours to minutes
   
Norwegian Mail: Increases sortation capacity by 35 %
   
Post Denmark: Saves over half billion Kroner
   
Canada Post: Optimizes Parcel Distribution Business
   
PWC: Creates Logistics & Systems Simulators
   
Posten: Redesigns Letter Terminal
   
Schneider: Overhauls Logistics Network
   
Logistics Company: Prevents fatal business decision
   
Airline Company: Minimizes Highloader time
   
Ellos AB: Verifies 25% improvement in sortation
   
Danish Rail: Increases Train Route efficiency by 50%
   
JB Hunt: Transforms logistics process
   

Danish Mail: Saves 20% in Personnel Expenses

   
Ideas for Modeling and Simulation of Supply Chains with Arena
   
Evaluating the Performance of Supply Chain Simulations with Tradeoffs Between Multiple Objectives
   
Supply Chain Management Tradeoffs Analysis
   
Army Logistician article "A New Tool for Simulation Modeling of Logistics Support" on process workflow from Visio to Arena to Visio

 

Related Information
Back to Home Page
 
Manufacturing
Logistics / Warehousing
Military / Defense
Health Care
Contact Centers
Business Process Reengineering