Arena Product Overview

Industry Forums Join a forum dedicated to industry-focused issues. View the forum threads or register to post your own messages!

Click a link below to view its corresponding industry success story.



Catalyst Paper Corporation Improves Shipping Efficiency: Reduces Costs by $1-2 Million Canadian
   
PepsiAmericas slide presentation at IIE (zip file)
   
Consumer Electronics Manufacturer Reduces Inventories by 70%, Lead Time by 86%
   
Bayer Corporation: Eliminates Expense of Proposed Investment
   
ITG : Locates Major Bottlenecks for Adhesives Manufacturer
   
ITG: Helps increase Sales by More Than $1 Million
   
Tire Manufacturer: Avoids Capital Equipment. Saves Millions
   
SPTC: Decreases WIP up to 80% and Cuts Cycle Time by 60-65%
   
Ford Brazil: Designs Engine Plant from the Ground Up
   
Personal Care Products Manufacturer: Avoids $1 Million Expense
   
Appliance Manufacturer: Evaluates Production/Distribution Operations
   
Apparel Manufacturer Evaluates Systems Throughput, Scheduling Operations, and More
   
Apparel Manufacturer: Creates Distribution System Transition
   
Span Tech: Tests Ideas for System Improvement
   
Airport Package Sortation Facility: Fine-tunes Conveyor Systems
   
Cable Factory Manufacturer: Uses model for sales and demonstrations
   
ITT Flygt: Predicts Capacity Requirements
   
Danish Steel Works: Locates 10% Excess Capacity
   
Post Denmark: Improves Mail Sortation Process
   
KFK: Optimizes Production Planning and Silo Allocation
   
Understanding the Fundamentals of Kanban and Conwip Pull Systems Using Simulation
   
Using Automation for Finishing Room Capacity Planning
   
A Capacity Planning Tool for the Tuxedo Middleware Used in Transaction Processing Systems
   
Major Electronics Manufacturer: Redesigns global supply chain
   
Document Image Manufacturer: Saves More than $1 Million
   
Web-based Evaluation of Material Handling Alternatives for Automated Manufacturing: A Parallel Replications Approach
   
Module-based Modeling of Flow-type Multistage Manufacturing Systems Adopting Dual-Card Kanban System
   
Optimal Lot Sizing with Capacity Constraints and Auto-correlated Interarrival Times
   
A Resource Reconciliation Mechanism for a Manufacturing Federation Coordinated Using an MRP/ERP System
   

 

Related Information
Back to Home Page
 
Manufacturing
Logistics / Warehousing
Military / Defense
Health Care
Contact Centers
Business Process Reengineering